Making 1xEV-DO Over Air Measurements
1xEV-DO over air measurements provide a quick method of verifying 1xEV-DO transmitter performance. These transmitter measurements can be made on a base station from the convenience of your vehicle without taking the base station out of service. Over air measurements are especially useful in maintaining hard-to-access cell sites such as pole-top base stations.
- "Preparing to Make 1xEV-DO Over Air Measurements"
- "Criteria for Making Valid 1xEV-DO Over Air Measurements"
- "Performing a Basic 1xEV-DO Over Air Measurement"
The 1xEV-DO Analyzer and Over Air option may also be used to measure signals at a coupled port on the transmitter.
Important metrics for both Tx and Over the Air measurements include:
- Frequency Error
- PN and Time Offsets
- Non Idle Power
- Idle On/Off Ratio
- Pilot + MAC power
- Pilot Rho (estimated)
- MAC Rho (estimated)
NOTE: To achieve valid over-the-air measurements, the test set must be stationary (not moving).